Building-by-Building Projects, Renovations, and Upgrades
On this page, you will find highlights of our latest capital developments, system enhancements, and modernization efforts designed to elevate our campus environment and support student success.
Useful links
- Minor Renovations 2026/27
- Replacing carpet in room 105
- Replace steam radiators with electric heaters throughout the building
- Paint exterior siding of the building
- Replace the exterior facia boards
- Install light bollards on the south side of the building to increase lighting along the pathway
- Upgrade electrical panel on the North and South side of the building
- Install new boiler (December 2026)
- Install new transformer (December 2026)
- Install new building access controls (November/December 2026)
- Under construction (tentative completion date June 2027)
- No activity at this time
- Upgrade sewage lift station (December 2026)
- No activity at this time
- Recommissioning building controls
- Upgrade fire alarm system throughout the entire building
- Recommissioning building controls
- No activity at this time
- Off-line
- No activity at this time
- Roof replacement - lower section over the Clay lab (October/November 2026)
- Replace HVAC units (January 2027)
-
Parking Lot A: No activity at this time
-
Parking Lot B: Closed due to construction
-
Parking Lot C: Closed due to construction
-
Parking Lot E: No activity at this time
-
Parking Lot F: No activity at this time
-
Parking Lot G: NO activity at this time
-
Parking lot Upgrades in February 2027 (12 Electric charging stationS will be installed)
-
-
Parking Lot H: No activity at this time
-
Parking Lot I: Southeast section closed off 19th Ave due to construction
-
Parking Lot J: No activity at this time
- Building was demolished in 2026
- Install new building access controls (November/December 2026)
- Building was demolished in 2026
- Replace fire doors on the 2nd floor leading into Student Government (December 2026)
- Replace hot water tank (400 gal) in the 2nd-floor mechanical room (December 2026)
- Building was demolished 2026
- Scheduled to be demolished in May/June 2027
- Under construction (tentative completion date May 2027)